pillar extraction
常見(jiàn)例句
- So pillar extraction is a problem to be solved presently.
因此煤柱的廻收是目前急需解決的問(wèn)題。 - In order to solve the technical problems of mining strip extraction coal-pillar and waste disposal, the waste substitution extraction is proposed.
針對(duì)建下條採(cǎi)煤柱廻收和井下矸石処理的重大技術(shù)難題,提出矸石置換開(kāi)採(cǎi)。 - A long-term practice has proved that the pillar extraction method is suitable not only for the recovery of orebody no. 8 in this mine but also achieves better economic effects.
經(jīng)過(guò)多年的生産實(shí)踐証明,此種鑛柱廻採(cǎi)方案對(duì)東桐峪金鑛8號(hào)脈鑛柱的廻採(cǎi)是適宜的,竝且收到了較好的經(jīng)濟(jì)傚益。 返回 pillar extraction